Skip to content
PALBON-SuitesComplete ERP Solution

Glossary

Trade, shipping and banking terms as PALBONTradeFinance uses them.

Term Meaning
46A The credit's list of documents required (SWIFT field 46A)
47A The credit's additional conditions (SWIFT field 47A): wording rules the documents must meet
71D The credit's charges clause: who pays which bank charges
ADB, ARB, DB, GAR, NAR Coal quality bases: air-dried, as received, dry, gross as received, net as received
Addendum A signed change to a contract after signing (ADD I, ADD II…)
All-in cost A bank quote's or funding offer's total cost: commissions, interest and fees
Applicant The party that asks its bank to open a credit (the buyer)
AWB Air waybill number of a courier consignment
Back-to-back Buying and selling the same cargo, each side a leg of one trade
Beneficiary The party paid under a credit (the seller)
Beneficiary's certificate The beneficiary's own statement the credit asks for (for example that copies were e-mailed)
Bill of exchange (draft) The payment order drawn on the bank under the credit (42C tenor, 42A drawee)
B/L Bill of lading: the carrier's receipt and title document; its date starts the presentation clocks
Charter party The contract for the hire of the vessel
COA / CoSA Certificate of (sampling and) analysis
COHC Certificate of hold cleanliness
COO Certificate of origin
COW Certificate of weight
Despatch Money the shipowner (or seller) pays for loading faster than laytime allows
Demurrage Money owed for using more time than laytime allows
Deviation A term where one leg's contract differs from the other's
Discrepancy A way a presented document does not comply with the credit
DSR Draft survey report: the cargo weight by the vessel's draft
Exposure What a credit holds on a bank facility: its amount plus tolerance
Facility A bank's limit for credits, guarantees or loans
FCA, FOB, FOBT F-terms: the buyer arranges the carriage
CFR, CIF C-terms: the seller pays the carriage (and insurance on CIF)
Framework contract A long-term agreement that individual shipments call off
Free pratique Permission from the port health authority for the vessel to enter and work
GCV Gross calorific value of coal (kcal/kg)
ISM International Safety Management code compliance of a vessel
KYC Know your customer: the checks before trading with a party
Laycan The window (lay days and cancelling) within which the vessel must arrive
Laytime The time allowed to load or discharge
Leg One side of a trade: the purchase or the sale
Maximum amount A credit's amount plus its tolerance (39A)
MT700, MT707, MT760, MT767 SWIFT messages: issue of a credit, amendment of a credit, issue of a guarantee, amendment of a guarantee
NN documents Non-negotiable copies sent directly to the buyer
NOR Notice of readiness: the master's notice that the vessel is ready to load or discharge
Novation Transfer of a contract's rights and duties to a new party
P&I Club The vessel's protection and indemnity insurer
PEP Politically exposed person
Presentation Delivering the documents to the bank under a credit
Price formula How a quality result changes the price, with caps and rejection limits
Rejection limit The quality value beyond which the buyer may reject the cargo
SHINC, SHEX, SATPM, FHEX Laytime terms: Sundays and holidays included / excluded; excluded from Saturday noon; Fridays and holidays excluded
Sight, usance A credit paid on presentation, or a number of days later
SOF Statement of facts: the vessel's timed events in port
Tolerance The allowed difference in quantity or amount (for example ±10%)
UBO Ultimate beneficial owner
UCP 600, ISP98, URDG 758 The ICC rules for documentary credits, standby credits and demand guarantees
WIBON, WIPON, WIFPON, WCCON Whether in berth / in port / in free pratique / customs cleared or not: laytime counts while waiting
WPD, WWD Weather permitting day, weather working day